Warlocks bounty board

#0001 · Mural · Standard

Mural Execution

Template refinement

Target installation location supplied by client

Priced after surface size + execution scope are confirmed

Execute a Murals.ng mural from an already-approved design at a target location. The Warlock verifies the surface, captures dimensions, confirms install readiness, executes the approved design, and submits proof for review.

Bounty trigger

Bounty comes in only after Murals.ng has a completed/approved mural design and a target installation location.

Completion outputs

  • Confirmed surface dimensions and estimated square metres
  • Surface/readiness report with photos
  • Execution plan and material/procurement list
  • Completed mural installed at target location
  • Final proof package for review and client receipt

Required inputs

Completed mural design/render/spec from Murals.ng

Target installation location/address

Client/site contact and access window

Known wall/surface area if already provided

Deadline or desired installation window

Sub-bounties / required subtasks

01

Required first

Design + location intake

Process

  1. 1. Receive completed mural design/render/spec from Murals.ng.
  2. 2. Confirm exact target installation address and site contact.
  3. 3. Record access window, restrictions, and deadline.
  4. 4. Flag missing design/location details before field work starts.

Required outputs

  • Approved design reference attached to bounty
  • Verified target location and site contact
  • Access window and deadline captured

02

Warlock-determined

Surface measurement + site verification

Process

  1. 1. Arrive at target location and identify the exact mural surface.
  2. 2. Measure width and height of the usable surface.
  3. 3. Calculate estimated square metres.
  4. 4. Photograph the full wall, left/right angles, close-ups, obstructions, and measurement proof.
  5. 5. Record material, texture, moisture/cracks/peeling paint, access constraints, lighting, and whether ladder/scaffold is needed.

Required outputs

  • wall_width_m
  • wall_height_m
  • estimated_area_sqm
  • surface condition notes
  • site photo set + measurement proof
  • readiness recommendation: ready / needs prep / blocked

03

Requires review before paint

Execution scope + material plan

Process

  1. 1. Compare approved design to measured surface dimensions.
  2. 2. Confirm whether design scaling/cropping is acceptable or needs Murals.ng approval.
  3. 3. List paints, primer, sealant, brushes, rollers, tape, protective sheets, access tools, and labour needs.
  4. 4. Estimate material spend and execution time.
  5. 5. Do not proceed if design, scale, surface, or budget conflicts are unresolved.

Required outputs

  • approved execution scope
  • material/procurement list
  • budget and compensation basis
  • go/no-go decision before execution

04

Execution prep

Procurement + surface preparation

Process

  1. 1. Buy or collect approved materials within the approved budget.
  2. 2. Upload purchase receipts and material photos before painting starts.
  3. 3. Prepare the surface: clean, tape, prime, protect floor/furniture, and mark layout/grid/reference points where needed.
  4. 4. Capture before and preparation photos.

Required outputs

  • material purchase receipts
  • material photos before use
  • before-wall photos
  • surface preparation photos

05

Paint/install approved design

Mural execution

Process

  1. 1. Paint strictly according to the approved Murals.ng design/spec.
  2. 2. Do not change composition, colours, text, scale, or finish without approval.
  3. 3. Upload progress photos at agreed checkpoints.
  4. 4. Escalate any site condition that conflicts with the approved design or timeline.

Required outputs

  • progress photo set
  • deviation/escalation notes if any
  • completed mural ready for final proof

06

Completion gate

Final proof + review receipt

Process

  1. 1. Clean the work area.
  2. 2. Capture final front photo, angle photos, close-ups, room/context photos, and short video where useful.
  3. 3. Capture client/site contact acknowledgement if available.
  4. 4. Submit operator notes, material usage, issues, and final proof package for reviewer approval.

Required outputs

  • final mural photo/video proof package
  • client/site acknowledgement
  • operator completion notes
  • review decision: approved / needs resubmission / rejected
  • client-ready receipt summary